Certificate Provisioning for Charging Hardware Manufacturers
Every charger needs its own certificate for ISO 15118-2, ISO 15118-20 and Plug&Charge, and that certificate must be requested, installed and kept up to date. With the Hubject EVSE TLS and Plug&Charge Service, charging hardware manufacturers take on this task for their customers. The manufacturer's backend connects directly to the Hubject vehicle-to-grid (V2G) public key infrastructure (PKI), obtains certificates for each charger for both ISO versions and keeps them current, while charge point operators (CPOs) only need to authorize the charger.

Benefits
How it works
From manufacturer onboarding to automatic authentication at the charger in five steps.
Onboard to the Hubject V2G PKI
The charging hardware manufacturer is onboarded to the Hubject V2G PKI, and its chargers are preconfigured with the trusted certificate chain: the Hubject V2G Root and the intermediate certificates.
Connect the backend
The manufacturer's charger backend connects directly to Hubject, registers each charger and retrieves the certificates it requires.
The CPO authorizes the charger
The CPO authorizes the charger through its standard OCPP connection.
Hubject issues the certificates
Hubject issues a certificate per charger for ISO 15118-2 and ISO 15118-20 in parallel. The manufacturer delivers the certificates to the charger over its own connection, without requiring the CPO's OCPP connection, and manages renewals throughout the certificate lifecycle.
Charging starts automatically
The vehicle and charger authenticate each other automatically when the driver plugs in. The CPO handles authorization with eMobility providers (EMPs) through eRoaming as usual.
Features
The service moves certificate handling from the CPO to the charging hardware manufacturer, using the Hubject V2G PKI that already connects vehicle manufacturers, EMPs and CPOs for Plug&Charge.
For charge point operators
CPOs can offer Plug&Charge on their chargers without operating their own PKI service, running a certificate project or first upgrading their backend. The CPO authorizes the charger through OCPP and continues its normal operations.
Requirements for issuing certificates
To issue certificates, the charging hardware manufacturer needs either an EVSE Check or a self-certification for each charger type, plus a side letter from each CPO.
EVSE Check
Self-certification
CPO side letter
Pricing
Pricing consists of a one-time setup fee and an annual fee per SECC ID for each ISO version. The annual fee decreases as volume increases.
One-time fees
Annual fee per SECC ID, per ISO version
Available in Europe, the Americas and Asia-Pacific
The service is available to charging hardware manufacturers that operate a backend for their chargers. It is delivered through a direct connection between the manufacturer's backend and the Hubject certificate API.

Deliver Plug&Charge as a service
Contact Hubject Business Development to begin onboarding.



