Cybersecurity

Secure preconditioning for electric bus fleets with VDV261

VDV261 is the standard for preconditioning electric buses at the depot. It lets public transport operators heat or cool every bus while it charges, over a secure, encrypted connection, so each bus leaves at the right temperature with a full battery. Hubject provides the certificates that keep that connection trusted.

Contact us

Secure communication between the bus and the depot

Encrypted by design
Departure schedules, diagnostics and commands are commercially sensitive and safety-relevant, so the bus, the charge point and the depot’s back-end system communicate over an encrypted, authenticated connection.
Certificates at the core
Every connection relies on security certificates from a trusted certificate authority (CA). Hubject issues the certificates for VDV261, for each depot charge point and each fleet back-end system.
Built on the same root as Plug&Charge
VDV261 uses the encrypted, authenticated communication between vehicle and charge point that Plug&Charge is built on, and both are secured by the Hubject vehicle-to-grid (V2G) root. Bus manufacturers that bring Plug&Charge to their vehicles with Hubject are building on the same foundation.

Buses that are ready for every departure

With secure communication in place, operators can precondition their buses while they charge, heating or cooling them through the charge point the bus is already plugged into.

More range for every route

Heating and cooling use a lot of energy. When this happens during charging, the energy comes from the grid instead of the battery, so the bus starts its route with more range.

A comfortable start for drivers and passengers

Drivers and passengers step into a bus that is already at the right temperature.

Preconditioning that follows your timetable

The depot’s charging and load management system schedules preconditioning for the whole fleet, based on each bus’s departure time.

Compatible across manufacturers

Because VDV261 is built on ISO 15118, it works with buses and charge points from different manufacturers.

How VDV261 works at the depot

VDV261 runs within the same ISO 15118 session the bus already uses to charge. The Hubject V2G root certificate only needs to be installed on each bus once.

Electric bus plugging in and opening an ISO 15118 connection with the charge pointDepot charge point presenting its certificateBus checking the charge point certificate against the V2G rootVDV261 service starting inside the charging sessionPreconditioned bus ready for departure
The bus connects

When the bus plugs in, it opens an ISO 15118 connection with the charge point.

The charge point identifies itself

The charge point presents its certificate, which links back to the Hubject V2G root.

The bus confirms the connection is trusted

The bus checks the certificate against the V2G root installed on it.

The VDV261 service starts

The VDV261 service opens inside the running charging session.

The bus is prepared for departure

Departure times, preconditioning settings and diagnostics pass securely between the depot management system and the bus.

Getting started with VDV261

1. Share a technical contact

Hubject works with your charge point supplier and depot IT team in a single call.

2. Test with one bus

Hubject provides a test certificate set, so you can check everything works on one charge point and one bus.

3. Roll out depot by depot

Certificates are rolled out step by step, with no fleet downtime.

Integrated with Vector vCharM

Vector has built Hubject’s VDV261 certificates into vCharM, its charging and energy management system. Hubject issues and renews the certificates, and vCharM installs them automatically on the charge points and in the depot.

Hubject and Vector vCharM integration for VDV261

Go deeper

Bring VDV261 preconditioning to your depot

Hubject provides the certificates that keep VDV261 secure, so your depot can start preconditioning with confidence. Talk to the team to start with a test certificate set.